Studies and work on the South-West Europe High-Speed Rail Link (PP3) - Lisbon-Madrid Axis - Évora-Mérida cross-border stretch
Code: 2007-EU-03080-P
Total Cost of Investiment:
22.2 million euros
Funding:
64.4 million euros
Preparatory contract work to implement the link between the Third Tagus
Crossing and Oriente Station-Lisbon, an integral part of the Lisbon-Madrid (PP3) High-Speed Rail Link
Code: 2009-PT-03082-E
Total Cost of Investiment:
27 million euros
Funding:
1.5 million euros
Studies on the Alcântara underground rail section - PP8
Code: 2010-PT-91129-S
Total Cost of Investment:
3.3 million euros
Funding:
0.5 million euros
Regulation (EU) No 913/2010 of the European Parliament and of the Council of 22 September 2010 concerning a European rail network
for competitive freight Implementation of Freight Corridor No 4
Code: 2011-EU-95107-S
Total Cost of Investment:
2.1 million euros
Funding:
2.1 million euros
Study on the implementing and creation of rail freight transport
corridors, including pilot projects and telematic applications to apply to ETI
Code: 2012-EU-94031-S
Total Cost of Investment:
15.6 million euros
Funding:
7.8 million euros
Preparation of Technical Rules for a 3 Rail Infrastructure
Code: 2013-PT-91039-S
Total Cost of Investment:
0.8 million euros
Funding:
0.4 million euros
Accelerating/Facilitating of the Implementation of the Atlantic Corridor
Code: 2013-EU-91053-S
Total Cost of Investment:
2.1 million euros
Funding:
1 million euros