Guarda, Sabugal, Almeida
Âmbito da Intervenção
The modernization of a stretch on the Beira Alta line Between Cerdeira and Vilar Formoso includes the following work:
Complete renovation of the track between km 223+537 and km 252+091 (60E1, multi-purpose crossing);
Construction of 7 bypasses, the largest of which is 1km away up to 95m from the channel;
Stabilization of the track platform and improvement of the drainage system;
Construction of elevated walkways in Cerdeira and Vilar Formoso;
Electrification at 2 x 25kv/50 Hz in bypasses;
Installation of traction return current system and protection soil;
Rehabilitation of 2 railway bridges;
Extension of passenger platforms at Cerdeira, Miuzela, Freineda, Aldeia and Vilar Formoso;
Renovation of railway layouts;
Installation of new electronic signaling and telecommunications;
Fencing around stretch.
The passenger platforms at Gata, Vila Fernando and Rochoso will also be extended, located between km 209+000 and 223+000;
Benefícios
The modernization of this stretch will provide:
Improved safety conditions and comfort; Reliability and continuity of railway operations;
Start a new life cycle for the infrastructure, which is now prepared for the future migration to the European gauge;
Increased maximum length of goods trains to 750m.
Financiamento Comunitário