Sines/Elvas Rail Link (Spain)
Sines-Ermidas-Grândola Stretch (Work)
Code: 2016-PT-TMC-0065-M
Total Cost of Investment:
44.1 million de euros
Funding:
33.7 million de euros
Aveiro - Vilar Formoso Rail Link in the Atlantic Corridor – Execution Project and Work
Code: 2015-PT-TM-0395-M
Total Cost of Investment:
547.7 million de euros
Funding:
375.9 million de euros
Studies for the South International Corridor - (Sines/Setúbal/Lisbon-Caia) within the Atlantic Corridor
Code: 2015-PT-TM-0382-S
Total Cost of Investment:
2.9 million de euros
Funding:
2.5 million de euros
Sines/Elvas Rail Link (Spain)
Évora-Caia Stretch - 2nd Stage
Code: 2016-PT-TMC-0059-M
Total Cost of Investment:
73 million de euros
Funding:
55.8 million de euros